• © ALPHA IC

Canteen Ottobrunn

Munich

 

At the Ottobrunn site, the client developed a canteen as a public service provided in an industrial setting. This property replaces an old dilapidated canteen. A canteen operator was engaged for the provision of services in the medium term.

The facility can seat 500 and serve 1,200 guests daily. Alpha was engaged to plan the HVAC system and to provide FM consulting. 

Client IVG Businesspark vor München II GmbH & Co. KG
Consulting services Running Cost Analysis (Quick Check)
FM Compliant Design
Energy Supply Concept
MEP design
Use Canteen
GFA ca. 4.600 m²
Land Area 2.980 m²
Construction 2008
Invest approx. 2,3 Mio EUR
Realization 2006-2008
  • Project implemented over a short period
  • Planning of the HVAC system incl. in-house coordination with Facility Management
  • Use of a general contractor model

Bamberg · Nuremberg · Munich · Frankfurt · Vienna  Contact