• © ALPHA EE
  • © USACE EUD

Spangdahlem Elementary School

Spangdahlem

The Landesbetrieb LBB Trier plans the new construction for the Elementary School der Airbase Spangdahlem for about 800 pupils. The buildings will be partly dismantled and extended by a new building. The complex has a multi-storey multi-purpose room with a stage, kitchen, gymnasium and administrative offices.

Alpha was commissioned to create an energy concept that both meets the high requirements of a LEED certification and the EEWärmeG (Renewable Energy Heat Act). The successful proof according to EnEV 2009 is the third requirement.

 

 

Infographics

 

The evaluation of thermal comfort in accordance with DIN EN 15251 is a further result of the 3D simulation.

Client Landesbetrieb Liegenschafts- und Baubetreuung Trier
Services Energy Concept
LEED Certification
LEED Commissioning
Energy Modeling
Proof according to ENEV 2009 / EEWärmeG
Use School
GFA 14.930 m²
Realization 2013-2017
Certification LEED for New Construction in Schools v3
Silver aimed
  • One of the first schools in Germany with LEED Certification
  • Coordination of the energy concept on Energy Saving Ordinance, EEWärmeG and ASHRAE 90.1
  • Ensuring user comfort and energy efficiency by thermal simulation
  • Interface between the U.S. Corps of Engineers and the LBB Rheinland Pfalz

Bamberg · Nuremberg · Munich · Frankfurt · Vienna  Contact