With the new construction of the "Zusestraße" grammar school for secondary level I (3 classes) and secondary level II (5 classes), three buildings were built in Cologne-Lövenich with rooms for the administration, specialist classes, all-day rooms, educational center (PZ), school kitchen, canteen and an assembly hall, which can also be used as a meeting place outside of school hours. The new school complex also includes a triple sports hall, which can also be used by local clubs. The project was planned and implemented by a total contractor (TU) on behalf of Gebäudewirtschaft Köln (GWK). Alpha IC was commissioned by GWK as the commissioning manager to manage and monitor the commissioning process. The commissioning manager acts as an external project manager for the client (GWK) and acts on its behalf. The client delegates to him the authority to issue instructions and powers of attorney to the other project participants. The aim of the IBM is to consider all technical systems of the various trades as a closed technical system and to carry out a comprehensive functional test across all trades in order to prove the required functionality of the entire system. A further objective is to implement the documentation and data maintenance requirements for the City of Cologne's CAFM program to ensure that operator responsibility is maintained from day one.
Performances |
Ensuring energy-efficient and resource-saving operation |
Reduction of operating times by avoiding unnecessary system operation |
|
Optimization of room temperatures, ventilation times and air volumes |
|
Evaluation of main meters and relevant sub-meters to identify and optimize energy consumption |
|
Consideration of comfort for students and teachers in all optimization phases |
|
Client |
Building management of the City of Cologne |
Use |
School, education and research |
BGF |
17.889 sqm |
Period of Performance |
09/2021 – 12/2023 |
Performances |
Ensuring energy-efficient and resource-saving operation |
Reduction of operating times by avoiding unnecessary system operation |
Optimization of room temperatures, ventilation times and air volumes |
Evaluation of main meters and relevant sub-meters to identify and optimize energy consumption |
Consideration of comfort for students and teachers in all optimization phases |
Client |
Building management of the City of Cologne |
Use |
School, education and research |
BGF |
17.889 sqm |
Period of Performance |
09/2021 – 12/2023 |
Based on our value culture, we want to measure and present the impact of our projects.
Our ESG radar visualizes the greatest impact on ESG metrics.
The areas of action that the project has impacted in particular are highlighted.