With the new construction of the "Zusestraße" grammar school for secondary level I (3 classes) and secondary level II (5 classes), three buildings were built in Cologne-Lövenich with rooms for the administration, specialist classes, all-day rooms, educational center (PZ), school kitchen, canteen and an assembly hall, which can also be used as a meeting place outside of school hours. The new school complex also includes a triple sports hall, which can also be used by local clubs. The project was planned and implemented by a total contractor (TU) on behalf of Gebäudewirtschaft Köln (GWK). Alpha IC was commissioned by GWK as the commissioning manager to manage and monitor the commissioning process. The commissioning manager acts as an external project manager for the client (GWK) and acts on its behalf. The client delegates to him the authority to issue instructions and powers of attorney to the other project participants. The aim of the IBM is to consider all technical systems of the various trades as a closed technical system and to carry out a comprehensive functional test across all trades in order to prove the required functionality of the entire system. A further objective is to implement the documentation and data maintenance requirements for the City of Cologne's CAFM program to ensure that operator responsibility is maintained from day one.

Performances

Ensuring energy-efficient and resource-saving operation

Reduction of operating times by avoiding unnecessary system operation

Optimization of room temperatures, ventilation times and air volumes

Evaluation of main meters and relevant sub-meters to identify and optimize energy consumption

Consideration of comfort for students and teachers in all optimization phases

Client

Building management of the City of Cologne

Use

School, education and research

BGF

17.889 sqm

Period of Performance

09/2021 – 12/2023

Performances

Ensuring energy-efficient and resource-saving operation

Reduction of operating times by avoiding unnecessary system operation

Optimization of room temperatures, ventilation times and air volumes

Evaluation of main meters and relevant sub-meters to identify and optimize energy consumption

Consideration of comfort for students and teachers in all optimization phases

Client

Building management of the City of Cologne

Use

School, education and research

BGF

17.889 sqm

Period of Performance

09/2021 – 12/2023

Alt Text

Based on our value culture, we want to measure and present the impact of our projects.
Our ESG radar visualizes the greatest impact on ESG metrics.

The areas of action that the project has impacted in particular are highlighted.

Daniel Genzler

B. Eng. Energy and Building Technology B. A. Business Administration and Senior Project Manager at Alpha IC GmbH

Mobile: +49 (151) 422 294 18