The project is the first construction phase for the extension and renovation of the Physics Department at the Garching campus of the TU Munich. Main uses include laboratories with high technical requirements as well as associated office and meeting areas. Alpha IC is the technical project controller responsible for commissioning management and technical monitoring. It is active in this role since the project was planned.
- Ensuring a targeted interaction of the individual technical facilities
- Ensuring optimum plant operation from the outset
- Reflecting future operational matters already in the design and calling for tenders phase
- Creation of a concept for technical monitoring in the first year of operation
Client |
Staatliches Bauamt München 2 |
Services |
Commissioning management: Project control services for commissioning, submission and transfer processes (technical project control), commissioning concept, participation in the compilation of performance requirements, monitoring of cross-trade operational testing, technical monitoring |
Use |
Institute and Research Building |
GFA |
13.138 m² |
Costs |
50 Mio. Euro |
Construction |
2019-2021 |
Consulting |
2018-2022 |
Client |
Staatliches Bauamt München 2 |
Services |
Commissioning management: Project control services for commissioning, submission and transfer processes (technical project control), commissioning concept, participation in the compilation of performance requirements, monitoring of cross-trade operational testing, technical monitoring |
Use |
Institute and Research Building |
GFA |
13.138 m² |
Costs |
50 Mio. Euro |
Construction |
2019-2021 |
Consulting |
2018-2022 |