The project is the first construction phase for the extension and renovation of the Physics Department at the Garching campus of the TU Munich. Main uses include laboratories with high technical requirements as well as associated office and meeting areas. Alpha IC is the technical project controller responsible for commissioning management and technical monitoring. It is active in this role since the project was planned.


  • Ensuring a targeted interaction of the individual technical facilities
  • Ensuring optimum plant operation from the outset
  • Reflecting future operational matters already in the design and calling for tenders phase
  • Creation of a concept for technical monitoring in the first year of operation

Client

Staatliches Bauamt München 2

Services

Commissioning management: Project control services for commissioning, submission and transfer processes (technical project control), commissioning concept, participation in the compilation of performance requirements, monitoring of cross-trade operational testing, technical monitoring

Use

Institute and Research Building

GFA

13.138 m²

Costs

50 Mio. Euro

Construction

2019-2021

Consulting

2018-2022

Client

Staatliches Bauamt München 2

Services

Commissioning management: Project control services for commissioning, submission and transfer processes (technical project control), commissioning concept, participation in the compilation of performance requirements, monitoring of cross-trade operational testing, technical monitoring

Use

Institute and Research Building

GFA

13.138 m²

Costs

50 Mio. Euro

Construction

2019-2021

Consulting

2018-2022