The new building for the inner city comprehensive school (igis) on Severinswall in Cologne created space for the implementation of new pedagogical space and teaching concepts in so-called clusters. A double gymnasium was also integrated into the building. The most striking design element of the new building, designed by Molestina Architects, are the imposing barrel roofs. They look like waves on the outside and like vaulted ceilings on the top floor. Climate protection and energy efficiency were an essential part of the development and realization of the new building. This also includes the use of district heating, photovoltaic systems to generate electricity and solar shading systems linked to the outside temperature and heat recovery via the ventilation systems. The building was constructed according to passive house standards. The best possible conditions have been created for quality of stay and learning in terms of temperature control, indoor air, ideal lighting and sound insulation.

The project was planned and implemented by a total contractor (TU) on behalf of Gebäudewirtschaft Köln (GWK). Alpha IC was commissioned by GWK as commissioning manager to manage and control the commissioning process. The commissioning manager acts as an external project manager for the client (GWK) and acts on its behalf. The client assigns him powers of instruction and authority over the other project participants. His tasks include ensuring that the client's requirements are met. To this end, the commissioning manager continuously monitors the IBM-relevant processes, e.g. by checking documents, carrying out IBM control appointments and site inspections. Any deviations identified are pointed out and the necessary measures for rectification are requested from the TU. 

The aim of the IBM is to consider all technical systems of the various trades as a closed technical system and to carry out a comprehensive functional test across all trades in order to prove the required functionality of the entire system. A further objective is to implement the documentation and data maintenance requirements for the City of Cologne's CAFM program to

Commissioning management ensures that the planned characteristics of building operation are realized. It leads to risk minimization and is a relevant component of the economical use of resources during subsequent operation.


Services

Ensuring energy-efficient and resource-saving operation

Reduction of operating times by avoiding unnecessary system operation

Optimization of room temperatures with the aim of saving heating energy

Optimization of ventilation times and air volumes by recording the carbon dioxide concentration with the aim of saving heating and electrical energy

Recording and evaluation of both the main meters and relevant sub-meters to identify and optimize energy consumption

Monitoring the blower door test and checking compliance with the passive house standard

Cient

"Gebäudewirtschaft der Stadt Köln"

Use

School, education & research

GFA

4.740 m²

Realisation

10/2021 - 10/2023

Services

Ensuring energy-efficient and resource-saving operation

Reduction of operating times by avoiding unnecessary system operation

Optimization of room temperatures with the aim of saving heating energy

Optimization of ventilation times and air volumes by recording the carbon dioxide concentration with the aim of saving heating and electrical energy

Recording and evaluation of both the main meters and relevant sub-meters to identify and optimize energy consumption

Monitoring the blower door test and checking compliance with the passive house standard

Cient

"Gebäudewirtschaft der Stadt Köln"

Use

School, education & research

GFA

4.740 m²

Realisation

10/2021 - 10/2023


Special challenges 

  • Communication with the responsible authorities 
  • Connecting the building automation system to the City of Cologne's existing management control system 
  • Coordination and review of the CAFM file 
  • Carrying out interdisciplinary functional testing 
  • Coordinating and checking the cross-trade trial operation Instruction management 
  • Coordination of the awarding of maintenance services 
  • Photovoltaic system with data logger / online portal 
  • Checking compliance with the passive house standard 
  • Checking the handed over commissioning documentation for completeness and content. 
  • Warranty management


Alt Text

Based on our value culture, we want to measure and present the impact of our projects.
Our ESG radar visualizes the greatest impact on ESG metrics.

The areas of action that the project has impacted in particular are highlighted.


Florian Dubisch 

Dipl.-Ing. Supply Engineering and Partner at Alpha IC GmbH 

Mobile: +49 172 3216912